University of Central Florida - Parking Garage C
Restocon’s UCF Garage C project faced many obstacles over its duration, beginning with a condensed schedule, as this project needed to be completed in between semesters over the summer. Couple that with the fact that two thirds of the garage’s existing sealants, assumed urethane, turned out to be silicone, this project was challenging from day one!
With over 20,000LF of sealants to be removed and replaced, various concrete repairs, epoxy injection, traffic coatings, clip connector reweldments, double tee bracing installation, expansion joint removal and replacement, as well as shotblasting and sealing the 152,000+ square feet of top deck; Restocon was able to condense the already compressed schedule and turn over another quality product to our client.
Tom Slater’s attention, dedication and leadership really drove this project to the finish line. Bill Howell led the crew as our Site Superintendent, kept an open line of communication with management, and motivated our field techs to keep this project moving in the right direction. This project was a success from beginning to end, and it showcases how operating together as a team can trump any obstacles brought to our doorstep. Great job to everyone involved in this one!!
Address: 12998 Gemini Blvd E, Orlando, FL 32816