3000 Post Oak Garage Repairs

9 Level Parking Structure Managed by Cushman & Wakefield

Restocon was brought to the project by Walter P. Moore to assess and perform the following repairs:

  •  Horizontal and Vertical Concrete Structural Repairs due to deteriorating conditions

  • Sealant and Waterproofing replacement on double TEE garage to help with longevity and drainage

  • Replacement of deteriorated bearing pads

  • Structural Corbel Repairs (Double TEE End Supports)

  • Epoxy Injection on Stem Flanges and Supports

  • Plumbing Repairs and Sealant For Garage Drain Systems

  • Traffic Coating Systems around Columns and Supports

  • Steel Clean and Coat to prevent further damage and provide longevity

 Project Manager – Maria Fernandez

Address: 3000 Post Oak Blvd (In Galleria Area), Houston, TX 77056