3000 Post Oak Garage Repairs
9 Level Parking Structure Managed by Cushman & Wakefield
Restocon was brought to the project by Walter P. Moore to assess and perform the following repairs:
Horizontal and Vertical Concrete Structural Repairs due to deteriorating conditions
Sealant and Waterproofing replacement on double TEE garage to help with longevity and drainage
Replacement of deteriorated bearing pads
Structural Corbel Repairs (Double TEE End Supports)
Epoxy Injection on Stem Flanges and Supports
Plumbing Repairs and Sealant For Garage Drain Systems
Traffic Coating Systems around Columns and Supports
Steel Clean and Coat to prevent further damage and provide longevity
Project Manager – Maria Fernandez
Address: 3000 Post Oak Blvd (In Galleria Area), Houston, TX 77056